Every desalination plant must remineralise its product water before distribution, and lime is one of the main reagents used to do it. Over almost two decades, the equipment manufactured by Sodimate has been supplied to desalination and water projects in the United Arab Emirates, Saudi Arabia and Bahrain, through EPC contractors such as Metito, Suez, Degremont, OTV and Cadagua.
- Manufacturer
- Sodimate (France)
- Region
- UAE, Saudi Arabia, Bahrain
- Application
- Lime storage, extraction and dosing for remineralisation and pH control
- Period
- 2008 to 2025
The challenge
Desalinated water is aggressive: stripped of calcium and alkalinity, it corrodes distribution networks unless it is remineralised. Plants therefore consume hydrated lime continuously, often delivered in bulk or in big bags, in a hot and sometimes humid coastal climate. Lime that bridges in a silo, cakes in a hopper or doses irregularly quickly becomes a water-quality issue.
Selected references in the region
The table below summarises references listed by Sodimate for desalination and water projects in the GCC. Each line describes the equipment supplied for the lime line.
| Year | Project | Country | Customer | Equipment supplied |
|---|---|---|---|---|
| 2008 | Fujairah | UAE | OTV | 4 silos of 200 m³, 4 feeding systems DDS 400, 4 screw feeders DDMR 100, 4 injectors ID 120, 2 preparation tanks of 5 m³ |
| 2009 | Al Dur | Bahrain | Degremont | 2 silos of 220 m³, 2 feeding systems DDS 400, 2 screw feeders DDMR 120, 2 injectors ID 120, 2 preparation tanks, 1 hopper |
| 2018 | King Abdullah Economic City | Saudi Arabia | Metito Saudi | 1 silo of 55 m³, feeding system ZCD 400, screw feeder DDMR 80, screw conveyor DMR 100, injector ID 100 |
| 2019 | Duba SWRO plant | Saudi Arabia | Metito | 2 silos of 60 m³, 2 feeding systems ZCD 400, 2 screw feeders DDMR 100, 2 screw conveyors DMR 120, 2 injectors ID 120 |
| 2020 | Floating desalination plant | Saudi Arabia | Metito | 3 silos of 65 m³, 2 feeding systems ZDM 400, 2 screw feeders DDMR 120, 2 screw conveyors DMR 120, injectors ID 120 and ID 150 |
| 2024 | Jubail (sodium bisulphite) | Saudi Arabia | S.S.E.M. | 2 big bag discharge hoppers of 1.75 m³, 2 ZFP 800, 2 conveyors, 2 injectors ID 150, 2 preparation tanks, 2 electrical panels |
| 2025 | Amaala, lime milk preparation | Saudi Arabia | Suez International | Big bag station, dosing system ZFP 400, screw conveyors DDMR 40 and DMR 70, injector ID 80 |
| 2025 | ADPG barges | UAE | Tecton Engineering & Construction | 1 m³ big bag stand, 4 feeding systems, 1 hydro-ejector |
| n/a | Idam Al Zawrah | UAE | Cadagua | Lime slurry plant from big bags: 4 big bag unloaders with dosing systems, skid-mounted tanks, pumping and electrical panel |
Other Sodimate references in Saudi Arabia include projects at Shuaibah III, Jazan, Yanbu, Tanajib and King Abdullah Economic City, covering reagents such as hydrated lime, quicklime, sodium metabisulphite, activated carbon and microsand.

What these installations have in common
- Storage sized to consumption: silos from 55 to 220 m³ for continuous plants, big bag stations for smaller or temporary needs.
- Mechanical extraction: feeding systems (DDS, ZCD, ZDM series) that keep lime flowing without bridging.
- Controlled dosing and injection: screw feeders, conveyors and ID injectors delivering lime to preparation tanks at a stable rate.
- Redundancy: duplicated lines on most large plants, so that one line can be maintained while the other runs.
Relevance for new projects
With new SWRO capacity under development across the region, lime systems remain a critical package. Soditech supports EPC contractors and operators in defining lime storage and dosing configurations, with the technical support of Sodimate.
Source: Sodimate reference lists (desalination and Saudi Arabia). Projects and equipment as listed by the manufacturer.
Résumé en français : l'article complet est disponible en anglais (bouton EN).
Toute usine de dessalement doit reminéraliser l'eau produite avant distribution, et la chaux est l'un des principaux réactifs utilisés. Depuis près de vingt ans, les équipements Sodimate ont été fournis à des projets d'eau et de dessalement aux Émirats, en Arabie saoudite et à Bahreïn, via des EPC comme Metito, Suez, Degremont, OTV ou Cadagua.
Quelques références
Fujairah (OTV, 2008 : 4 silos de 200 m³), Al Dur à Bahreïn (Degremont, 2009 : 2 silos de 220 m³), King Abdullah Economic City (Metito, 2018), Duba SWRO (Metito, 2019), usine de dessalement flottante (2020), Jubail (S.S.E.M., 2024), Amaala (Suez International, 2025), barges ADPG (Tecton, 2025) et Idam Al Zawrah (Cadagua).
Points communs
Stockage dimensionné à la consommation (silos ou stations big-bag), extraction mécanique sans voûtage, dosage et injection à débit stable, et redondance des lignes sur les grandes usines. Soditech accompagne les EPC et exploitants de la région dans la définition de ces lignes chaux, avec l'appui technique de Sodimate.
Le tableau détaillé des références est disponible dans la version anglaise.